Title 18 - Unified Development Ordinance
18.140 Applications and Procedures
18.140.030 Pre-application Conference
-
A.A pre-application conference with the City's professional planning staff is required prior to submission of any application for a: (i) rezoning, (ii) special use permit, (iii) preliminary development plan, (iv) preliminary plat; or (v) by-right housing development. The purpose of this conference is to:
-
1.Acquaint the applicant with the procedural requirements of this Unified Development Ordinance;
-
2.Provide for an exchange of information regarding the proposed development plan and applicable elements of this Unified Development Ordinance, the Comprehensive Plan and other development requirements;
-
3.Advise the applicant of any public sources of information that may aid the application;
-
4.Identify policies and regulations that create opportunities or pose significant restraints for the proposed development;
-
5.Review any proposed concept plans and consider opportunities to increase development benefits and mitigate undesirable project consequences; and
-
6.Permit staff input into the general design of the project.
-
-
B.The applicant shall provide a concept sketch of the site, at a standard engineer scale, for consideration by the staff. The applicant shall also include a summary of the project that lists the proposed density of residential uses and the floor area ratio of non-residential uses.
-
C.The Director may waive the requirement of a pre-application conference or waive any part of the submission requirements. The Director may also require additional plans, details, studies and reports be provided at the time of a pre-application conference.
(History: Ord. ZRR-3527, §14, 2026; Ord. ZRR-3416 §11, 2023; Ord. ZRR-2782 §1, 2008; ZRR-2343 §19, 2002; ZRR-1725; ZRR-1637)