Title 13 - Streets and Sidewalks

13.12 Construction on Rights-of-Way

13.12.450 Permit Applications.

  1. A.
    Application for a Right-of-way Permit shall be submitted to the City Engineer by either the ROW-user or by the Person who will do the work and/or excavation in the Right-of-way. Before an application may be submitted, the Applicant must attend a pre-application conference, unless waived by the City Engineer.
  2. B.
    Right-of-way applications shall contain and be considered complete only upon receipt of the following:
    1. 1.
      Compliance with verification of Registration;
    2. 2.
      Submission of a completed permit application form, including all required attachments and scaled drawings showing the location and area of the proposed project and the location of all existing and proposed Facilities at such location;
    3. 3.
      A traffic control plan;
    4. 4.
      Payment of all money due to the City for permit fees and costs, for prior excavation costs, for any loss, damage or expense suffered by the City because of the Applicant’s prior excavations of the Right-of-way or for any Emergency actions taken by the City, unless the payment of such money is in dispute and timely appealed as provided hereafter or an alternative payment arrangement is approved by the City Engineer.  
  3. C.
     All applications shall be processed within the timeframes required by state and federal law.
  4. D.
     If an Applicant has submitted an application for a permit for the installation, construction, maintenance or repair of multiple Facilities, that Applicant may not submit another application for a permit for the installation, construction, maintenance or repair of multiple Facilities until the first application has been approved or denied. This provision may be waived by the City Engineer or when required by applicable law.

(History: Ord. No. RW-3296 §12, 2020; Ord. RW-3139 §6, 2016; RW-2410 §9, 2002; RW-2184, 2000)[Source or prior law: 13.12.060.]

Effective on: 1/1/1901