18.400 Right-of-way and Easement Exaction Process
18.400.020 Definitions
For the sole purposes of this Chapter, the following definitions shall apply:
- A.Development Approval means the approval of any rezoning, special use permit, revised preliminary plan, final development plan, preliminary plat, final plat or site plan.
Effective on: 1/1/1901
- B.Integrated Development Project means a project to be developed or which has been partially developed in segments or phases.
Effective on: 1/1/1901
- C.Redevelopment Project means development of property for which a use has previously been established pursuant to a Development Approval.
Effective on: 1/1/1901
- D.Right-of-way means the land area required by the City to construct and maintain a thoroughfare; including any associated improvements such as street lights, traffic signals, sidewalks and bike-hike trails; and to provide areas for public utilities to place their equipment and transmission lines. Right-of-way does not include the land within the premises of a temporary construction easement.
Effective on: 1/1/1901
- E.Temporary Construction Easement means the conveyance of an interest in land or the premises of such conveyance granting to the city permission to use the land area outside of the right-of-way that is required to construct a thoroughfare and ancillary facilities where such construction will occur for a limited length of time and after such time all rights to the land shall revert to the property owner. All temporary construction easements for thoroughfare construction shall be on a form supplied by the city and shall be fully executed by the property owner(s) prior to submission to the city. The depth of any temporary construction easement(s) needed for all abutting Thoroughfare frontages shall be equal to the building or parking setback, whichever is lesser, for the zoning district(s) in which the property is located.
Effective on: 1/1/1901
- F.Thoroughfare means those streets designated as such on the Official Street Map.