Title 13 - Streets and Sidewalks
13.10 Public Street, Streetlighting And Sidewalk Requirements
13.10.110 Variances and Appeals.
- A.Variances
Any variance of the provisions in this Chapter shall be submitted to and approved by the Governing Body through the Public Works Committee. The City Engineer may grant a variance to the Standards which have been adopted by the City Engineer.
In the event that a conditional variance is granted by the Public Works Committee related to sidewalk installation and a demand is later made by the City Engineer for the sidewalk to be installed, the person or entity having ownership of the tract that is the subject matter of the variance at the time of the demand shall, within 45 days from the date of mailing of the demand by the City Engineer by certified mail, install the sidewalk in accordance with this Chapter.
- B.Appeals
Appeals of decisions made by the City Engineer will be made in accordance with the process specified in Section 13.10.030.
(History: Ord. STR-2849 §11, 2010)
Effective on: 1/1/1901