Title 18 - Unified Development Ordinance
18.400 Right-of-way and Easement Exaction Process
18.400.070 Exemptions
Development Approval applications shall be exempt from any rights-of-way and temporary construction easements dedication requirements if any of the following circumstances apply:
- A.The property which is the subject of the application does not abut a Thoroughfare, or, in the case of an Integrated Development Project, no part of the land subject to the Development Approval abuts a Thoroughfare.
- B.The amount of existing right-of-way meets or exceeds the minimum standards established by the City and summarized in Table 18.460.110 for Thoroughfares and a temporary construction easement, meeting or exceeding the minimum setback requirements for the zoning district(s) along the property’s Thoroughfare frontage, already is in place.
- C.The proposed development (or, in the case of an Integrated Development Project, the entire project) will not generate more than one hundred (100) additional daily vehicle trip ends and/or a five percent (5%) or greater increase in the total daily trip generation from the site.
- D.If circumstances specific to the impacts of the proposed development, such as requirements for auxiliary lanes identified as part of a traffic impact study or other traffic analysis, show the need for additional rights-of-way and temporary construction easements, then the additional rights-of-way and temporary construction easements shall be dedicated to the City independent of the process described in this Chapter.
(History: Ord. ZRR-2482 §1, 2004; ZRR-2015 §7, 97)
Effective on: 1/1/1901