18.400.020 Definitions

For the sole purposes of this Chapter, the following definitions shall apply:

  1. E.
    Temporary Construction Easement means the conveyance of an interest in land or the premises of such conveyance granting to the city permission to use the land area outside of the right-of-way that is required to construct a thoroughfare and ancillary facilities where such construction will occur for a limited length of time and after such time all rights to the land shall revert to the property owner. All temporary construction easements for thoroughfare construction shall be on a form supplied by the city and shall be fully executed by the property owner(s) prior to submission to the city. The depth of any temporary construction easement(s) needed for all abutting Thoroughfare frontages shall be equal to the building or parking setback, whichever is lesser, for the zoning district(s) in which the property is located.